News:

Jim Brochu, Chair of Building Committee passed away Dec 18 in a car accident.

​

Status:

Foundation permit issued, and excavation work has begun.

​

Questions?

Contact  Jim Brochu, Chair of Building Committee, or

Matthew Bachtold, Library Director,  508-529-6272.

​

Project Description:

The Upton Community Center is a new facility of 15,132 square feet to house the Upton Town Library and the Council on Aging, at an estimated project cost of $12.4 million.

Located at 9 Milford Street, the facility includes a redesigned playground and shared parking with the adjacent VFW.

​

Approved by Upton Voters:

Town Meeting  5/8/2021

Town Election  5/11/2021

Site Excavation

Jan 4, 2022

Several excavators are at work on the site.

In the background can be seen work on the slope of the playground leading down to the nature play area.

The deep excavation on the west side is to remove unsuitable materials.  This is the deepest part of the site work and next week this area will be replaced with compacted construction fill that will provide a sturdy base for the concrete building foundations.

Some large rocks / ledge has been uncovered on the east side that requires a breaker bit to remove.

This site work was anticipated in the bid documents, no unexpected site conditions have been found yet.

Later in the project, more excavation will be done along the edge of center brook so a retaining wall can be installed.

2022.1.4 excavations 1.jpg
2022.1.4 excavations 2.jpg
2022.1.4 excavations 3.jpg