News:

Updated interior renderings with finishes.

See Design Documents.

​

Status:

Building permit has been issued.

​

Questions?

Contact Community Center Building Committee, or

Matthew Bachtold, Library Director,  508-529-6272.

​

Project Description:

The Upton Community Center is a new facility of 15,132 square feet to house the Upton Town Library and the Council on Aging, at an estimated project cost of $12.4 million.

Located at 9 Milford Street, the facility includes a redesigned playground and shared parking with the adjacent VFW.

​

Approved by Upton Voters:

Town Meeting  5/8/2021

Town Election  5/11/2021

First Steel Supports

Mar 24, 2022

Utility conduits are being installed below the future floor.

Sewer pipes, water pipes and electrical lines are all being installed.

The first steel support beams are in place, outlining the Great Room on the north side.

Hoping to see the concrete floor slab poured during the second week of April.  The pour for the entire floor will be completed in one long day of work.

2022.3.24 Utilities.jpg

Mar 24, View of the north-west corner showing the utility conduits in the kitchen and mechanical rooms.

2022.3.24 Steel Framing 1.jpg

Mar 24, Looking across Milford Street at the steel supports outlining the Great Room.

2022.3.24 Steel Framing 2.jpg

Mar 24, Another view of the steel supports that show the North side of the building.